Mini Brewery BlonderBeer.Type N 2000 l
Mini Brewery BlonderBeer.Type N 2000 l. 12 000 l beer per week
Productivity of the brewing system: Quantity of brews: Products: Heating of mash tun brew kettle and boiler:
BREW HOUSE (1800 L of hot wort per brew)
![]() 1 pc. – ROP - Grinder for grounding malt. Capacity 600 kg per hour 1 pc. – CEF-01.blonderbeer. Filter vat. 1 pc. – CEC-01.blonderbeer. brew kettle (mash tun). 1 pc. – CEW-01.blonderbeer. whirpool. 1 pc. – CEK-01.blonderbeer - boiler (hot water vessel) 1 pc. – CKF18 (P I). central control panel of the brewhouse Brewhouse computerized control panel by the predetermined program is used for comfort and facilitation of brewer’s work. It is offered to you possible to load into memory up to 7 different recipes and brewing technologies. 1 set – SN-01 - system for monitoring and adjusting the flow of wort, filtration and cooling of beer
Includes: - SN-01 cylindrical vessel situated on 4 legs, made of stainless steel and two glass cylinders – 1pc; - pipeline system of the brewhouse made of stainless steel DIN 1.4301 – 1 set; - pump No1 for hot water supplementation – 1 pc; - pump No2 for mixture of wort and grain supplementation from the brew kettle to the filter vat – 1 pc; - pump No3 for wort pumping from the filter vat to the brew kettle – 1pc; - pump No4 for wort pumping from the brew kettle to the whirpool and into the heat exchanger VT-01 – 1pc; - F2 fine filter with screw cap and filter element made of special tissue – 1 pc; - heat exchanger VT-01 – 1 pc; - valves – 1 set; - laboratory accessories – 1 set; - aerator АЕ-01 – 1 pc; FERMENTATION UNIT
![]() 12 pcs. – CCE-01.blonderbeer. Fermentation&Conditioning Unitank 1 pc. – Blonderbeer CV-01 - equipment for collection and storage of yeast 2 pcs. – ССE-03.blonderbeer. Service tank (storage of finished beer) 12 pcs. – HE-18 individual control panel of cooling temperature of unitanks CCE-01.blonderbeer. 2 pcs. – HE-18 individual control panel of cooling temperature of service tanks CCE-03.blonderbeer. 1 pc. – BE18 transformer (220-24 V) to the control panels НЕ18; 1 pc. – MC-3 (EBARA CDHm 70/05) pump for pumping beer liquid and beer between brewery vessels. Temperature control of fermentation, conditioning and service tanks is realizing by individual control panels НЕ18(P IV) installed on every tank. Central control panel is simple and easy to operate and servicing. Cable is hidden inside the special covers, which are included in the standard set of the brewery 1 pc. – MS-01 - mobile station for cleaning and disinfection (CIP)
Includes: 1 pc. – frame-base on 4 wheels
1 pc. – pump EBARA CDHm 70/05 1 pc. – capacity of the vessel liters for a washing solution (heated) is 80 l 1 pc. – capacity for disinfectant of the vessel is 80 l 1 pc. – patch panel with valves and pipes 1 pc. – control panel ![]() FILTRATION AND FILLING OF BEER INTO KEG-BARRELS
1 pc. – KGF-1 - Kieselguhr filter (2 m2)
1 set - KG -02 - device for rinsing, washing, disinfection of keg-barrels and filling beer into keg-barrels:
Includes: 2 pcs. – rinsing device and washing device; 1 pc. – pump EBARA CDHm 70/05; 2 pcs. – filling heads; 1 pc. – control panel; 1 pc. – vessel for cleaning solution (heated), capacity 100 l; 1 pc. – steam generator. BEER PASTEURIZATION AND BOTTLING
1 pc. – TA-01 flow-through beer pasteurizer Productivity: 1.000 l / h;
Beer in the bottles, after pasteurization has period of storage at least 2 month. 1 pc. – MB-01 semi-automat for filling of beer in PET and glass bottles;
capacity 400 bottles per hour.
1 pc. – MB-02 semi-automat for capping PET and glass bottles; capacity 400 bottles per hour. ![]() COOLING SYSTEM OPTIMA 1
1 pc. – cooling unit COPELAND SCROLL;
1 pc. – CGK-01 vertical vessel of capacity 3000 l for cooling liquid made of sheet stainless steel 1 pc. – pump №1 MC-2 for ice water supplying to the tanks; 1 pc. – pump №2 MC-4 for ice water supplying to the heat exchanger VT-01; 1 pc. – pump №3 MC-4 for circulation of cooling liquid in vessel for ice water CGK-01;
1 set – cooling pipeline system of the fermentation, conditioning and service tanks ![]()
«Lager beer gold coloured, developed on the basis of the best German variety» NOTE: Our brewery technologist may develop other varieties of beer on your demand and taste. It's enough to give few bottles of beer, which is popular in a particular region of your country; our brewers will conduct a chemical analysis of the samples and create a beer close to the taste of the samples (not included in the cost of the brewery).
DELIVERY OF BREWING SYSTEM:
For delivery of the brewery BlonderBeer. Type N 2000 l it is needed three trucks or five 40-foot containers. Company TECHIMPEX can arrange the delivery of the brewing system to the customer’s company for additional payment. If you specify the city of delivery we will be able to inform you the price of the delivery.
SERVING THE MINI BREWERY:
Four persons (two technician-brewers and two auxiliary workers) are needed for servicing the brewery Type N 2000 l.
INSTALATION, REGULATION AND LAUNCHING OF THE MINI BREWERY
Installation, regulation and launching of the brewing system by trained work team of the company TECHIMPEX (in the price).
STAFF TRAINING:
OPTION 1.After launching the brewery at the client’s company, company TECHIMPEX will send the brewer for 21 days in your company for thorough training of your staff. NOTE: This option of the training included in cost of brewing system.
OPTION 2. Company TECHIMPEX has a possibility to send a brewer for a period from 1 to 6 months in your brewery enterprise, after it is launched, for more in-depth training. The cost of this service is 3500 Euros per month + return ticket + accommodation and food of brewer from company TECHIMPEX. Expensive, but the brewer has from 15 to 40 years of practice in the brewery. We have several brewers with such experience.
Payment terms, delivery time and installation:
Conditions of payment:
- 40% - advance payment after signing the contract - 60% - after the preparation of equipment for shipment / 3 days before shipmen; Delivery: FCA warehouse of Seller (Komarno, Slovakia) Delivery time: 80 days after receiving an advance payment Installation time: 12-14 days Guarantee period: 12 months