You are here

Minibrewery 6000

Brewery BlonderBeer.Type N 6000 l. 36 000 l beer per week
WE PROVIDE THE BREWERIES ON THE TURNKEY BASIS

Productivity of micro brewery:
       productivity of beer per day:                      6 000 L
       productivity of beer per week:                  36 000 L
       productivity of beer per year:              1 800 000 L

Quantity of brews
       quantity of brews per day:                                5
       quantity of brews per week:                            24
       quantity of brews per year:                         1200 / 50 week

Products:
       fresh beer (non-filtered beer)
       filtered beer
       pasteurized beer

Heating of mash tun brew kettle and boiler:
       1. (standard option) – electric heating (electric heater is placed in stainless steel cylinder)
       2. natural gas heating
       3. steam heating

BREW HOUSE (1800 L of hot wort per brew)
brewhouse for 6,000 liters brewery

1 pc. – ROP - Grinder for grounding malt. Capacity 600 kg per hour

1 pc. – CEF-01.blonderbeer. Filter vat. Gross capacity: 1850 l;
             Double wall stainless steel DIN 1.4301 tank with thermal insulation;
             Outer Ø1430 mm; Total height: 1950 mm; filter vat agitator with power NORD.

2 pcs. –CEC-01.blonderbeer. brew kettle (mash tun). Gross capacity: 2400 l;
             Double wall stainless steel DIN 1.4301 tank with thermal insulation;
             Outer Ø1534 mm; Total height: 2230 mm; mash tun kettle agitator with power NORD.

1 pc. – CEW-01.blonderbeer. whirpool.
             Double wall stainless steel DIN 1.4301 tank with thermal insulation;
             Gross capacity: 1850 l; Outer Ø1610 mm; Total height: 2150 mm.

1 pc. – CEK-01.blonderbeer - boiler (hot water vessel)
             Double wall stainless steel DIN 1.4301 tank with thermal insulation;
             Gross capacity: 3000 l.

1 pc. – CLV-01.blonderbeer - Ice water vessel
             Double wall stainless steel DIN 1.4301 tank with thermal insulation;
             Gross capacity: 3000 l.

1 pc. – CKF18 (P I). central control panel of the brewhouse
             Includes: subsidiary computerized control.
Computer panel of brew house equipment
Brewhouse computerized control panel by the predetermined program is used for comfort and facilitation of brewer’s work. It is possible to load into memory up to 7 different recipes and brewing technologies.
 
1 set – SN-01 - system for monitoring and adjusting the flow of wort, filtration and cooling of beer
             Includes:
             1 pc. – SN-01. Device for visual observation and automatical adjusting of the flow of wort;
             1 pc. – F2. Fine filter;
             1 pc. – pump No1. MC-1 for supplying of hot water from the boiler;
             1 pc. – pump No2. MC-1 for pumping of filtered wort from filter vat to brew kettle;
             1 pc. – pump No3. MC-2 for pumping of mixture of wort and grain from brew kettle to filter vat;
             1 pc. – pump No4. MC-1 for circulation of wort in whirpool and supplying of wort heat exchanger VT-01;
             1 pc. – pump No5. MC-1 for water supplying from ice water vessel CLV-01 to heat exchanger VT-01;
             1 pc. – VT-01. Heat exchanger;
             1 pc. – АЕ-01. Aerator;
             1 set. – valves;
             1 set. – pipeline system of the brewhouse made of stainless steel DIN 1.4301;
             1 set. – laboratory accessories.
 
FERMENTATION UNIT
Fermentation CKT Tanks 
 
36 pcs. – CCE-01.blonderbeer. Fermentation tank (CKT)
               Double wall stainless steel tank DIN 1.4301 with thermal insulation;
               individual cooling controlled by remote placed at the top of the tank;
               Gross capacity: 3640 l;
               Outer Ø1800 mm;
               Total height: 3050 mm;
               Cone angle: 72°
 
   1 pc. – Blonderbeer CVD-01 - Yeast propagation equipment
 2 pcs. – Blonderbeer СV-01 – equipment for collection and storage of yeast
              Includes:
              1 pc. – frame-base on 4 wheels;
              1 pc. – vessel for collection and storage of yeast with cooling jacket, capacity: 60 l;
              1 pc. – temperature control panel HE18;

  3 pcs. – ССE-03.blonderbeer. Service tank (storage of finished beer)
               Double wall stainless steel tank DIN 1.4301 with thermal insulation;
               individual cooling controlled by remote placed at the top of the tank;
               Gross capacity: 3400 l;
               Outer Ø1800 mm;
               Total height: 2750 mm;

Temperature control of fermentation, conditioning and service tanks is realizing by individual control panels НЕ18(P IV) installed on every tank. Central control panel is simple and easy to operate and servicing. Cable is hidden inside the special covers, which are included in the standard set of the brewery

36 pcs. – HE-18 central control panel of cooling temperature of unitanks CCE-01.blonderbeer.

  3 pcs. – HE-18 central control panel of cooling temperature of service tanks CCE-03.blonderbeer.

    1 pc. – BE18 transformer (220-24 V) to the control panels НЕ18

    2 pc. – MC-3 (EBARA CDHm 70/05) pump for transfer beer between tanks

    1 pc. – MS-01 - mobile station for cleaning and disinfection (CIP)
cleaning and disinfection (CIP) of CKT Brewing
             Includes:
             1 pc. – pump EBARA CDHm 70/05
             1 pc. – capacity of the vessel liters for a washing solution (heated) is 80 l
             1 pc. – capacity for disinfectant of the vessel is 80 l
             1 pc. – patch panel with valves and pipes
             1 pc. – control panel
             1 pc. – frame-base on 4 wheels
 
COOLING SYSTEM OPTIMA 1
1 pc. – MODUL 1
1 pc. – MODUL 2
1 set – cooling plastic pipeline system of the fermentation, conditioning and service tanks (1”)
COOLING SYSTEM of the brewery 6000 i/d
 
FILTRATION OF BEER
1 pc. – KGF-1 - Kieselguhr filter (2 m2)
 
FILLING UNIT (into keg-barrels)
1 set - KG -02M2 - device for rinsing, washing, disinfection of keg-barrels and filling beer into keg-barrels:
             Includes:
             1 pc. – rinsing device and washing device;
             1 pc. – vessel for cleaning solution (heated), capacity 160 l;
             1 pc. – pump EBARA CDHm 70/05;
             1 pc. – filling heads;
             1 pc. – control panel;
             1 pc. – steam generator;
Beer Filling line
 
BEER PASTEURIZATION
1 pc. – TA-01 flow-through beer pasteurizer
            Productivity: 3 000 l / h
            Beer in the bottles, after pasteurization has period of storage at least 2 month
 
BEER FILLING AND BOTTLING IN PET / GLASS BOTTLES
1 pc. – МВ-01 - Semi-automatic beer filling and bottling line in РЕТ and glass bottles
            Productivity: 400 pc / h.
1 pc. – МВ-02 - Semi-automatic closing machine for РЕТ bottles with a plastic cap or semi-automatic closing machine for
            glass bottles with a crown cap.
             Productivity: 400 pc / h.
BEER FILLING AND BOTTLING

Craft BeerThe breweries produced by TECHIMPEX produce all varieties and brands of beer, except non-alcoholic beer, which requires additional equipment. Besides, one variety of beer, depending  on the number and proportion of malt and hops, achieves various flavours, as well as the concentration of alcohol from mild beer varieties containing alcohol of 3,3% to a sufficiently strong beer containing alcohol of 8%.

The cost of the brewery includes recipes and brew technologies for 4 different varieties of beer:
«Lager beer gold coloured, developed on the basis of the best German variety»
«Lager beer amber coloured, developed on the basis of the best Czech variety»
«Red Irish beer»
«Black Irish beer»

 

DELIVERY OF MICRO BREWERY:
For delivery of the brewery BlonderBeer. Type N 6000 l it is needed seven trucks or twelve HC40-foot containers. Company TECHIMPEX can arrange the delivery of the brewery to the customer’s company for additional payment. If you specify the city of delivery we will be able to inform you the price of the delivery.
 
SERVING THE MICRO BREWERY:
Ten persons (four technologists-brewers and six auxiliary workers) are needed for servicing the brewery Type N 6000 l.
 
INSTALATION, REGULATION AND LAUNCHING OF THE MICRO BREWERY
Installation, regulation and launching of the microbrewery by team of the company TECHIMPEX. NOTES: The cost of the micro brewery includes installation of the microbrewery.
 
STAFF TRAINING:
OPTION 1. After launching the brewery at the client’s company, company TECHIMPEX will send the brewer for 21 days in your company for thorough training of your staff (included in the cost of the brewery). NOTES: This option of the training included in cost of micro brewery.
OPTION 2. Company TECHIMPEX has a possibility to send a brewer for a period from 1 to 6 months in your brewery enterprise, after it is launched, for more in-depth training. The cost of this service is 3500 Euros per month + return ticket + accommodation and food of brewer from company TECHIMPEX. Expensive, but the brewer has from 15 to 40 years of practice in the brewery. We have several brewers with such experience.
 
Payment terms, delivery time and installation: 
    Conditions of payment:
          - 40% - advance payment after signing the contract
          - 60% - after the preparation of equipment for shipment / 3 days before shipmen;
    Delivery: FCA warehouse of Seller (Komarno, Slovakia)
    Delivery time: 115 days after receiving an advance payment
    Installation time: 25 calendar days
    Training of 2-3 specialists included
    Guarantee period: 12 months
 
Our motto is - high quality, excellent service and reasonable price.
To get a full offer and approximate scheme of arrangement the mini brewery, please fill up the form placed on the Contacts.